View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture arc42 | ![]() Operations Time Blocking | ![]() Architecture ARID (Active Reviews for Intermediate Designs) |
|---|---|---|---|
Purposedifferent | arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes. | With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure. | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. |
Complexitydifferent | Low | Low | Medium |
Timedifferent | 1-2 Tage | 15-30 min Planung, laufend | 2–4 h review as a planning range; preparation and evaluation additional |
Participantsdifferent | 1-4 | 1 | Designers, developers as users, and facilitation |
Formatdifferent | Workshop + async | Async | Workshop + async |
Outputdifferent | Architecture Document, Context View, Runtime View, Deployment View | Blocked Calendar, Capacity View, Focus Plan | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions |
Tagsno overlap | ArchitectureDocumentationCommunication | PlanningTime managementFocus | ArchitectureEngineeringFeedbackValidationTasks |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






