View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture arc42 | ![]() Delivery Cost of Delay | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|
Purposedifferent | arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | High | Low |
Timedifferent | 1-2 Tage | 90-180 min | 45-90 min |
Participantsdifferent | 1-4 | 3-8 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Architecture Document, Context View, Runtime View, Deployment View | CoD Table, Prioritization Sequence | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | ArchitectureDocumentationCommunication | PrioritizationDeliveryEconomicsDecision | AssumptionsRiskDecisionDiscovery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






