View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Architecture Decision Record | ![]() Decision Making Three-Point Estimation | ![]() Delivery RAID Log |
|---|---|---|---|
Purposedifferent | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. |
Complexitydifferent | Low | Medium | Low |
Timedifferent | 15-45 min | 10-30 min je Item | 30 min Setup, dann laufend |
Participantsdifferent | 1-3 | 1-8 | 1-3 maintaining, briefing for everyone |
Formatdifferent | Async | Workshop + async | Async |
Outputdifferent | ADR File, Decision Log, Rationale | Three-Point Estimate, Risk Range, Assumption Notes | RAID Log, Status Report Source |
Tagsno overlap | ArchitectureRationaleDocumentationGovernance | EstimationUncertaintyForecasting | RiskTrackingStakeholdersGovernance |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






