View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Architecture Decision Record | ![]() Product Discovery Assumption Mapping | ![]() Delivery RAID Log |
|---|---|---|---|
Purposedifferent | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. |
Complexitydifferent | Low | Medium | Low |
Timedifferent | 15-45 min | 45-60 min | 30 min Setup, dann laufend |
Participantsdifferent | 1-3 | 2-8 | 1-3 maintaining, briefing for everyone |
Formatdifferent | Async | Workshop + async | Async |
Outputdifferent | ADR File, Decision Log, Rationale | Assumption map, Test backlog, Risk ranking | RAID Log, Status Report Source |
Tagsno overlap | ArchitectureRationaleDocumentationGovernance | AssumptionsRiskExperimentsValidation | RiskTrackingStakeholdersGovernance |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






