View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ABC Analysis | ![]() Delivery RAID Log | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|
Purposedifferent | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitysame | Low | Low | Low |
Timedifferent | 30-60 min | 30 min Setup, dann laufend | 45-90 min |
Participantsdifferent | 1-5 | 1-3 maintaining, briefing for everyone | 2-8 |
Formatdifferent | Async | Async | Workshop + async |
Outputdifferent | ABC Classification, Focus Rules, Control List | RAID Log, Status Report Source | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | PrioritizationOperationsPortfolio | RiskTrackingStakeholdersGovernance | AssumptionsRiskDecisionDiscovery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.