View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations 5 Whys | ![]() Facilitation Power Interest Grid | ![]() Facilitation Decision Jam |
|---|---|---|---|
Purposedifferent | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. |
Complexitysame | Low | Low | Low |
Timedifferent | 15-30 min | 30-60 min | 60-90 min |
Participantsdifferent | 2-6 | 2-8 | 4-10 |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Root cause notes, Countermeasures | Power Interest Grid, Strategy per Stakeholder | Problem Cluster, Prioritized Challenge, Experiment |
Tagsno overlap | Root causeIncidentLeanProblem solving | StakeholdersFacilitationAlignmentPlanning | FacilitationDecisionProblem solvingWorkshop |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






