methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
HighMediumMedium
Timedifferent
45-90 min10-30 min je Item45-60 min
Participantsdifferent
3-101-82-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsThree-Point Estimate, Risk Range, Assumption NotesAssumption map, Test backlog, Risk ranking
Tagsno overlap
LeanEconomicsSequencePrioritization
EstimationUncertaintyForecasting
AssumptionsRiskExperimentsValidation
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Paper illustration of Riskiest Assumption Test with a method-specific labelled workspace.
Product Discovery
Riskiest Assumption Test
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing