methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
HighHighLow
Timedifferent
45-90 min90-180 min30-60 min
Participantsdifferent
3-103-83-10
Formatdifferent
WorkshopWorkshopWorkshop + async
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsCoD Table, Prioritization SequenceRisk Matrix, Top Risk List
Tags1 shared
LeanEconomicsSequencePrioritization
PrioritizationDeliveryEconomicsDecision
RiskDecisionPrioritizationAssessment
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of ICE Scoring with its method-specific working model.
Product Strategy
ICE Scoring
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem