methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.
Complexitydifferent
HighHighLow
Timedifferent
45-90 min90-180 min1-2 h
Participantsdifferent
3-103-82-8
Formatdifferent
WorkshopWorkshopWorkshop + async
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsCoD Table, Prioritization SequenceDIBB document, Belief list, Bet list, Learning report
Tagsno overlap
LeanEconomicsSequencePrioritization
PrioritizationDeliveryEconomicsDecision
StrategyDecisionAssumptionsHypothesis
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Anonymous individual judgments pass through feedback loops to form a distribution.
Decision Making
Delphi Method
Paper illustration of the Force Field Analysis working structure.
Decision Making
Force Field Analysis
Paper illustration of Hypothesis Prioritization Canvas with a method-specific labelled workspace.
Product Discovery
Hypothesis Prioritization Canvas