View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Weekly Review | ![]() Operations Bottleneck Analysis | ![]() Operations Theory of Constraints |
|---|---|---|---|
Purposedifferent | In a week with many open loops, the method creates distance from operational noise. It organizes commitments, calendar, and projects so the next week becomes workable. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. |
Complexitydifferent | Low | Medium | High |
Timedifferent | 30-60 min | 1-3 h | 2-4 h Analyse, laufend |
Participantsdifferent | 1 | 3-8 | 3-12 |
Formatdifferent | Async | Workshop + async | Workshop + async |
Outputdifferent | Updated Task System, Weekly Focus, Next Actions | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Constraint Map, Improvement Plan, Flow Metrics |
Tagsno overlap | ProductivityExecutionPlanning | FlowMeasurementConstraints | OperationsConstraintsFlowImprovement |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






