View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Waste Analysis | ![]() Engineering Kanban | ![]() Operations Theory of Constraints |
|---|---|---|---|
Purposedifferent | For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. |
Complexitydifferent | Low | Medium | High |
Timedifferent | 45-120 min | Ongoing | 2-4 h Analyse, laufend |
Participantsdifferent | 2-8 | 2-12 | 3-12 |
Formatdifferent | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Waste Map, Prioritized Waste, Improvement Backlog | Kanban board, WIP policies, Flow metrics | Constraint Map, Improvement Plan, Flow Metrics |
Tagsno overlap | WasteLeanProcess improvement | FlowVisual managementDelivery | OperationsConstraintsFlowImprovement |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






