methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration for DMAIC.
Operations
DMAIC
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together.
Complexitydifferent
MediumLowHigh
Timedifferent
1-3 h1 h bis mehrere Wochen2-12 Wochen
Participantsdifferent
4-101-83-10
Formatdifferent
WorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Current-state map, Future-state map, Bottleneck listPDCA Log, Experiment Plan, Learning Outcome, Standard ChangeProject Charter, Measurement Plan, Cause Analysis, Control Plan
Tagsno overlap
LeanFlowWasteDelivery
Continuous improvementLeanExperiments
Continuous improvementQualityProcess improvement
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Waste Analysis.
Operations
Waste Analysis
Paper illustration for Kaizen Event.
Operations
Kaizen Event
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting