View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery Value Stream Mapping | ![]() Engineering Kanban | ![]() Systems Thinking Future Reality Tree |
|---|---|---|---|
Purposedifferent | When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. |
Complexitydifferent | Medium | Medium | High |
Timedifferent | 1-3 h | Ongoing | 2-4 h |
Participantsdifferent | 4-10 | 2-12 | 3-8 |
Formatdifferent | Workshop | Workshop + async | Workshop |
Outputdifferent | Current-state map, Future-state map, Bottleneck list | Kanban board, WIP policies, Flow metrics | Future Reality Tree, Negative Branches, Assumption List, Improved Injections |
Tagsno overlap | LeanFlowWasteDelivery | FlowVisual managementDelivery | Theory of ConstraintsSystems thinkingChange |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






