methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration for DMAIC.
Operations
DMAIC
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumHighMedium
Timedifferent
1-3 h2-12 WochenOngoing
Participantsdifferent
4-103-102-12
Formatdifferent
WorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Current-state map, Future-state map, Bottleneck listProject Charter, Measurement Plan, Cause Analysis, Control PlanKanban board, WIP policies, Flow metrics
Tagsno overlap
LeanFlowWasteDelivery
Continuous improvementQualityProcess improvement
FlowVisual managementDelivery
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Waste Analysis.
Operations
Waste Analysis
Paper illustration for Kaizen Event.
Operations
Kaizen Event
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle