View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Three-Point Estimation | ![]() Operations PDCA Cycle | ![]() Delivery Value Stream Mapping |
|---|---|---|---|
Purposedifferent | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible. |
Complexitydifferent | Medium | Low | Medium |
Timedifferent | 10-30 min je Item | 1 h bis mehrere Wochen | 1-3 h |
Participantsdifferent | 1-8 | 1-8 | 4-10 |
Formatdifferent | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Three-Point Estimate, Risk Range, Assumption Notes | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Current-state map, Future-state map, Bottleneck list |
Tagsno overlap | EstimationUncertaintyForecasting | Continuous improvementLeanExperiments | LeanFlowWasteDelivery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






