View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Three-Point Estimation | ![]() Systems Thinking Leverage Points | ![]() Facilitation Dot Estimation |
|---|---|---|---|
Purposedifferent | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. |
Complexitydifferent | Medium | High | Low |
Timedifferent | 10-30 min je Item | Half day | 5-20 min |
Participantsdifferent | 1-8 | 3-12 | 3-20 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Three-Point Estimate, Risk Range, Assumption Notes | Leverage Map, Action Strategy | Effort Heatmap, Risk Signals, Discussion Targets |
Tagsno overlap | EstimationUncertaintyForecasting | Systems thinkingChangeStrategy | EstimationEffortRisk |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






