View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Three-Point Estimation | ![]() Delivery Cost of Delay | ![]() Facilitation Dot Estimation |
|---|---|---|---|
Purposedifferent | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. |
Complexitydifferent | Medium | High | Low |
Timedifferent | 10-30 min je Item | 90-180 min | 5-20 min |
Participantsdifferent | 1-8 | 3-8 | 3-20 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Three-Point Estimate, Risk Range, Assumption Notes | CoD Table, Prioritization Sequence | Effort Heatmap, Risk Signals, Discussion Targets |
Tagsno overlap | EstimationUncertaintyForecasting | PrioritizationDeliveryEconomicsDecision | EstimationEffortRisk |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






