methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.
Complexitydifferent
MediumLowLow
Timedifferent
10-30 min je Item15-45 min5-20 min
Participantsdifferent
1-81-33-20
Formatdifferent
Workshop + asyncAsyncWorkshop
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesADR File, Decision Log, RationaleEffort Heatmap, Risk Signals, Discussion Targets
Tagsno overlap
EstimationUncertaintyForecasting
ArchitectureRationaleDocumentationGovernance
EstimationEffortRisk
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.