methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model
Paper illustration for Learning Review.
Operations
Learning Review
Paper illustration for 3-Circle Venn Diagram
Facilitation
3-Circle Venn Diagram
Purposedifferent
When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy.After a project phase with mixed results, the method makes learning from the individual case reusable. It connects events, decisions, and systemic conditions into robust insights.When three perspectives matter at the same time, a Three-Circle Venn Diagram shows the overlaps and remainders precisely. It makes visible where shared effect arises and where only a partial perspective applies.
Complexitydifferent
MediumMediumLow
Timedifferent
60-90 min1-3 h15-45 min
Participantsdifferent
3-63-102-8
Formatdifferent
WorkshopWorkshopWorkshop + async
Outputdifferent
Salience Diagram, Strategy per ClassLearning Review Notes, System Factors, Improvement ActionsVenn Diagram, Overlap Notes, Differentiators
Tagsno overlap
StakeholdersFacilitationAlignmentGovernance
LearningRetrospectiveIncidentOperations
ComparisonFacilitationAlignment
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Stakeholder Mapping
Facilitation
Stakeholder Mapping
A structured reflection surfaces what was liked, learned, lacked, and longed for. It is a conversation format and does not validate actions automatically.
Agile
4Ls Retrospective