methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Quality Attribute Workshop workspace showing the question, observations, and next decision.
Architecture
Quality Attribute Workshop
Paper illustration for Ideal Days.
Agile
Ideal Days
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.A Quality Attribute Workshop translates quality requirements into concrete scenarios and architecture impulses. The method brings product, engineering, and operations to the same view of desired properties.When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.
Complexitydifferent
LowMediumLow
Timedifferent
60-90 min2-4 h15-60 min
Participantsdifferent
4-125-152-9
Formatdifferent
WorkshopWorkshopWorkshop + async
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogQuality Scenarios, Priority List, Architecture ConcernsIdeal Day Estimates, Assumption Notes, Capacity Caveats
Tagsno overlap
RiskArchitectureWorkshopValidation
RequirementsArchitectureWorkshop
EstimationEffortAgile
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of Acceptance Criteria Workshop with a method-specific labelled workspace.
Agile
Acceptance Criteria Workshop
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation