View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Facilitation Power Interest Grid | ![]() Architecture Software Architecture Canvas |
|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly. |
Complexitysame | Low | Low | Low |
Timedifferent | 30-60 min | 30-60 min | 1-2 h |
Participantsdifferent | 3-10 | 2-8 | 3-10 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Risk Matrix, Top Risk List | Power Interest Grid, Strategy per Stakeholder | Architecture Canvas, Goals, Constraints, Quality Attributes |
Tagsno overlap | RiskDecisionPrioritizationAssessment | StakeholdersFacilitationAlignmentPlanning | CanvasArchitectureAlignmentWorkshop |