View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Architecture arc42 | ![]() Architecture ARID (Active Reviews for Intermediate Designs) |
|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes. | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. |
Complexitydifferent | Low | Low | Medium |
Timedifferent | 30-60 min | 1-2 Tage | 2–4 h review as a planning range; preparation and evaluation additional |
Participantsdifferent | 3-10 | 1-4 | Designers, developers as users, and facilitation |
Formatsame | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Architecture Document, Context View, Runtime View, Deployment View | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions |
Tagsno overlap | RiskDecisionPrioritizationAssessment | ArchitectureDocumentationCommunication | ArchitectureEngineeringFeedbackValidationTasks |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






