methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
LowHighLow
Timedifferent
20–45 min2-6 h15-30 min
Participantsdifferent
Small cross-functional group3-102-6
Formatsame
WorkshopWorkshopWorkshop
Outputdifferent
Risk list, Mitigation plan, Assumption logFMEA Table, Risk Priority, Mitigation ActionsRoot cause notes, Countermeasures
Tagsno overlap
RiskDecisionFailurePlanning
RiskQualityOperationsRoot cause
Root causeIncidentLeanProblem solving
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration for Root Cause Analysis.
Operations
Root Cause Analysis
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving