View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Pre-Mortem | ![]() Systems Thinking Evaporating Cloud | ![]() Engineering Failure Scenario Analysis |
|---|---|---|---|
Purposedifferent | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. |
Complexitydifferent | Low | Medium | Medium |
Timedifferent | 20–45 min | 60-120 min | 1-3 h |
Participantsdifferent | Small cross-functional group | 2-8 | 3-8 |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Risk list, Mitigation plan, Assumption log | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions |
Tagsno overlap | RiskDecisionFailurePlanning | Theory of ConstraintsAssumptionsSystems thinking | FailureResilienceRisk |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






