View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Pre-Mortem | ![]() Innovation Crazy 8s | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|
Purposedifferent | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | With only a few minutes available and a still-fuzzy solution search, the method forces a wide range of variants. It produces fast sketches before the first idea can settle in, making different directions directly comparable and open to further development. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitysame | Low | Low | Low |
Timedifferent | 20–45 min | 8-15 min | 45-90 min |
Participantsdifferent | Small cross-functional group | 1-10 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async |
Outputdifferent | Risk list, Mitigation plan, Assumption log | Sketch Set, Idea Shortlist, Direction Options | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskDecisionFailurePlanning | BrainstormingSketchingSpeedDivergenceDesign sprint | AssumptionsRiskDecisionDiscovery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






