methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper board with the four ROAM fields Resolved, Owned, Accepted, and Mitigated.
Agile
ROAM Board
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowLowHigh
Timedifferent
30-60 min20-40 min initial, dann laufendSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
2-83-15Evaluation team, architects, and relevant stakeholders
Formatdifferent
WorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Power Interest Grid, Strategy per StakeholderROAM Board, Owner ListPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
StakeholdersFacilitationAlignmentPlanning
RiskAgileTrackingAlignment
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Four paper stations connect system purpose, quality goals, risk cards and focused investigation with a target and gap profile.
Architecture
LASR (Lightweight Approach for Software Reviews)
Stakeholder Mapping
Facilitation
Stakeholder Mapping