methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration for Weekly Review.
Operations
Weekly Review
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.In a week with many open loops, the method creates distance from operational noise. It organizes commitments, calendar, and projects so the next week becomes workable.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitysame
LowLowLow
Timedifferent
1 h bis mehrere Wochen30-60 min15-30 min
Participantsdifferent
1-812-6
Formatdifferent
Workshop + asyncAsyncWorkshop
Outputdifferent
PDCA Log, Experiment Plan, Learning Outcome, Standard ChangeUpdated Task System, Weekly Focus, Next ActionsRoot cause notes, Countermeasures
Tagsno overlap
Continuous improvementLeanExperiments
ProductivityExecutionPlanning
Root causeIncidentLeanProblem solving
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper notes move from an inbox to action, project and calendar collections.
Operations
Getting Things Done
Paper illustration for Root Cause Analysis.
Operations
Root Cause Analysis
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving