View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations PDCA Cycle | ![]() Product Strategy Impact Mapping | ![]() Operations Kaizen Event |
|---|---|---|---|
Purposedifferent | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | When a goal needs to be connected to several possible paths, it shows chains of impact instead of feature lists. It connects business goal, behavior change, and measures. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. |
Complexitydifferent | Low | Medium | Medium |
Timedifferent | 1 h bis mehrere Wochen | 45-90 min | 0.5-5 Tage |
Participantsdifferent | 1-8 | 3-8 | 4-10 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Impact Map, Outcome Hypotheses, Delivery Options | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update |
Tagsno overlap | Continuous improvementLeanExperiments | OutcomesStrategyBehaviorPlanning | LeanContinuous improvementOperations |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






