View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Mind Mapping | ![]() Architecture ATAM (Architecture Tradeoff Analysis Method) | ![]() Facilitation Stakeholder Salience Model |
|---|---|---|---|
Purposedifferent | When a topic is still unclear and too many thoughts surface at once, Mind Mapping creates an open surface for ordering them. It makes connections, subtopics, and starting points visible without fixing them too early. | ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation. | When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy. |
Complexitydifferent | Low | High | Medium |
Timedifferent | 15-45 min | Several meetings plus preparation and analysis; total effort depends on scope | 60-90 min |
Participantsdifferent | 1-10 | Evaluation team, architects, and relevant stakeholders | 3-6 |
Formatdifferent | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Mind Map, Topic Clusters, Open Questions | Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations | Salience Diagram, Strategy per Class |
Tagsno overlap | BrainstormingIdeasMappingStructureFacilitation | ArchitectureQualityRiskTradeoffsStakeholders | StakeholdersFacilitationAlignmentGovernance |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






