methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the McKinsey 7S Framework with seven connected fields
Business Strategy
McKinsey 7S
Paper illustration for Time Blocking
Operations
Time Blocking
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model
Purposedifferent
McKinsey 7S checks whether Strategy, Structure, Systems, Shared Values, Skills, Style, and Staff fit together. Organizational misalignments become visible across multiple levers as a result.With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy.
Complexitydifferent
MediumLowMedium
Timedifferent
2-4 h15-30 min Planung, laufend60-90 min
Participantsdifferent
3-1213-6
Formatdifferent
WorkshopAsyncWorkshop
Outputdifferent
7S Assessment, Alignment Gaps, Change ActionsBlocked Calendar, Capacity View, Focus PlanSalience Diagram, Strategy per Class
Tagsno overlap
OrganizationStrategyAlignmentChange
PlanningTime managementFocus
StakeholdersFacilitationAlignmentGovernance
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Paper illustration for 3-Circle Venn Diagram
Facilitation
3-Circle Venn Diagram