View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Lean Startup | ![]() Delivery Cost of Delay | ![]() Architecture ARID (Active Reviews for Intermediate Designs) |
|---|---|---|---|
Purposedifferent | For uncertain business assumptions, the method forces the idea into contact with real market reactions early. It separates wishful picture, assumption, and observable behavior, so that learning becomes faster than planning. This translates uncertainty into measurable insight. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. |
Complexitydifferent | Medium | High | Medium |
Timedifferent | Wochen bis Monate je Lernzyklus | 90-180 min | 2–4 h review as a planning range; preparation and evaluation additional |
Participantsdifferent | 2-8 | 3-8 | Designers, developers as users, and facilitation |
Formatdifferent | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Hypothesis list, MVPs, Learning reports, Pivot or persevere decision | CoD Table, Prioritization Sequence | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions |
Tagsno overlap | LeanStartupValidationMVP | PrioritizationDeliveryEconomicsDecision | ArchitectureEngineeringFeedbackValidationTasks |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.