methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
HighHighLow
Timedifferent
2-8 h90-180 min60-90 min
Participantsdifferent
2-83-84-10
Formatdifferent
Workshop + asyncWorkshopWorkshop
Outputdifferent
Problem Analysis, Decision Analysis, Risk PlanCoD Table, Prioritization SequenceProblem Cluster, Prioritized Challenge, Experiment
Tags1 shared
Problem solvingRoot causeDecisionOperations
PrioritizationDeliveryEconomicsDecision
FacilitationDecisionProblem solvingWorkshop
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration for ABC Analysis
Operations
ABC Analysis