methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumHighLow
Timedifferent
Ongoing90-180 min15-30 min
Participantsdifferent
2-123-82-6
Formatdifferent
Workshop + asyncWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsCoD Table, Prioritization SequenceRoot cause notes, Countermeasures
Tagsno overlap
FlowVisual managementDelivery
PrioritizationDeliveryEconomicsDecision
Root causeIncidentLeanProblem solving
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration for Root Cause Analysis.
Operations
Root Cause Analysis
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping