View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Kaizen Event | ![]() Engineering Kanban | ![]() Delivery Value Stream Mapping |
|---|---|---|---|
Purposedifferent | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible. |
Complexitysame | Medium | Medium | Medium |
Timedifferent | 0.5-5 Tage | Ongoing | 1-3 h |
Participantsdifferent | 4-10 | 2-12 | 4-10 |
Formatdifferent | Workshop | Workshop + async | Workshop |
Outputdifferent | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Kanban board, WIP policies, Flow metrics | Current-state map, Future-state map, Bottleneck list |
Tagsno overlap | LeanContinuous improvementOperations | FlowVisual managementDelivery | LeanFlowWasteDelivery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






