methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Ideal Days.
Agile
Ideal Days
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitysame
LowLowLow
Timedifferent
15-60 min30 min Setup, dann laufend30-60 min
Participantsdifferent
2-91-3 maintaining, briefing for everyone2-8
Formatdifferent
Workshop + asyncAsyncWorkshop
Outputdifferent
Ideal Day Estimates, Assumption Notes, Capacity CaveatsRAID Log, Status Report SourcePower Interest Grid, Strategy per Stakeholder
Tagsno overlap
EstimationEffortAgile
RiskTrackingStakeholdersGovernance
StakeholdersFacilitationAlignmentPlanning
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation