methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Game Day workspace showing the question, observations, and next decision.
DevOps
Game Day
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
In preparing for rare incidents, the method tests response capability under controlled conditions. It shows where assumptions about stability, roles, and recovery are too optimistic.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
HighLowLow
Timedifferent
Halber Tag20–45 min15-30 min
Participantsdifferent
5-20Small cross-functional group2-6
Formatsame
WorkshopWorkshopWorkshop
Outputdifferent
Simulation Notes, Gaps List, Updated RunbooksRisk list, Mitigation plan, Assumption logRoot cause notes, Countermeasures
Tagsno overlap
ResilienceOperationsIncident
RiskDecisionFailurePlanning
Root causeIncidentLeanProblem solving
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis