methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
HighLowLow
Timedifferent
2-4 h20–45 min15-30 min
Participantsdifferent
3-8Small cross-functional group2-6
Formatsame
WorkshopWorkshopWorkshop
Outputdifferent
Future Reality Tree, Negative Branches, Assumption List, Improved InjectionsRisk list, Mitigation plan, Assumption logRoot cause notes, Countermeasures
Tagsno overlap
Theory of ConstraintsSystems thinkingChange
RiskDecisionFailurePlanning
Root causeIncidentLeanProblem solving
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration for Root Cause Analysis.
Operations
Root Cause Analysis
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving