View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Future Reality Tree | ![]() Agile Planning Poker | ![]() Facilitation Dot Estimation |
|---|---|---|---|
Purposedifferent | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When estimates within the team diverge too much, it puts differing expectations on a common test bench. It separates rough complexity from unspoken assumptions. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. |
Complexitydifferent | High | Low | Low |
Timedifferent | 2-4 h | 2-5 min je Item | 5-20 min |
Participantsdifferent | 3-8 | 3-9 | 3-20 |
Formatdifferent | Workshop | Workshop + async | Workshop |
Outputdifferent | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Relative Estimates, Assumption Notes, Split Candidates | Effort Heatmap, Risk Signals, Discussion Targets |
Tagsno overlap | Theory of ConstraintsSystems thinkingChange | EstimationAgileRelative sizingTeam | EstimationEffortRisk |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






