methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper fishbone diagram with a measurable effect at the head and six labeled cause branches.
Operations
Fishbone Diagram
Paper illustration of the Consensus Workshop working structure.
Facilitation
Consensus Workshop
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers.When a group needs a solid decision without outvoting individual factions, a Consensus Workshop creates a negotiable common ground. It makes agreement, reservations, and open tensions discussable at the same time.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
LowMediumLow
Timedifferent
30-60 min1-3 h30-60 min
Participantsdifferent
2-85-302-8
Formatsame
WorkshopWorkshopWorkshop
Outputdifferent
Fishbone Diagram, Cause Categories, Investigation BacklogConsensus Clusters, Theme Titles, Priority AreasPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
Root causeQualityOperations
FacilitationConsensusWorkshopAlignment
StakeholdersFacilitationAlignmentPlanning
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model