View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Fault Tree Analysis | ![]() Decision Making Risk Matrix |
|---|---|---|
Purposedifferent | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. |
Complexitydifferent | High | Low |
Timedifferent | 2-6 h | 30-60 min |
Participantsdifferent | 3-8 | 3-10 |
Formatsame | Workshop + async | Workshop + async |
Outputdifferent | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Risk Matrix, Top Risk List |
Tags1 shared | RiskRoot causeSafety | RiskDecisionPrioritizationAssessment |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.





