methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Fault Isolation.
Engineering
Fault Isolation
Paper illustration for Problem Framing Workshop.
Facilitation
Problem Framing Workshop
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected.When a team works on symptoms but the real question stays fuzzy, a Problem Framing Workshop sharpens the view of the right problem. It separates observation, interpretation, and target picture from each other.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
MediumLowLow
Timedifferent
30-180 min60-120 min60-90 min
Participantsdifferent
1-64-104-10
Formatdifferent
Workshop + asyncWorkshopWorkshop
Outputdifferent
Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault AreaProblem Statement, Scope Boundaries, Assumption List, Next Analysis QuestionsProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
TroubleshootingDiagnosisEngineering
FacilitationAlignmentDiscovery
FacilitationDecisionProblem solvingWorkshop
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of the Consensus Workshop working structure.
Facilitation
Consensus Workshop
Paper illustration for Hypothesis-Driven Troubleshooting.
Engineering
Hypothesis-Driven Troubleshooting
Paper illustration for 3-Circle Venn Diagram
Facilitation
3-Circle Venn Diagram
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping