View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Fault Isolation | ![]() Engineering Failure Scenario Analysis | ![]() Decision Making Pre-Mortem |
|---|---|---|---|
Purposedifferent | In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | Medium | Medium | Low |
Timedifferent | 30-180 min | 1-3 h | 20–45 min |
Participantsdifferent | 1-6 | 3-8 | Small cross-functional group |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault Area | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | TroubleshootingDiagnosisEngineering | FailureResilienceRisk | RiskDecisionFailurePlanning |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






