methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis
Paper illustration of VRIO Framework with its method-specific working model.
Business Strategy
VRIO Framework
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model
Purposedifferent
In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage.The VRIO Framework rates resources and capabilities on whether they are Valuable, Rare, Inimitable, and Organized. It compares strengths, risks, market logic, and courses of action. The result is captured as a VRIO table and strategic actions.When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy.
Complexitysame
MediumMediumMedium
Timedifferent
1-3 h90-180 min60-90 min
Participantsdifferent
3-83-63-6
Formatsame
WorkshopWorkshopWorkshop
Outputdifferent
Failure Scenarios, Risk Notes, Control Gaps, Test and Response ActionsVRIO Table, Strategic ActionsSalience Diagram, Strategy per Class
Tagsno overlap
FailureResilienceRisk
StrategyDiagnosisBusiness modelCapability
StakeholdersFacilitationAlignmentGovernance
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Business Model Stress Test with its method-specific working model.
Business Strategy
Business Model Stress Test
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid