View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Decision Making Pre-Mortem | ![]() Facilitation Dot Voting |
|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | When a workshop has produced too many options and the group needs to condense quickly, dot voting makes preferences visible in a short time. It bundles individual votes into a solid signal for the next selection. |
Complexitydifferent | Medium | Low | Low |
Timedifferent | 1-3 h | 20–45 min | 5-15 min |
Participantsdifferent | 3-8 | Small cross-functional group | 3-20 |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Risk list, Mitigation plan, Assumption log | Ranked list, Consensus signal, Shortlist |
Tagsno overlap | FailureResilienceRisk | RiskDecisionFailurePlanning | FacilitationVotingConsensusPrioritization |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






