View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Decision Making Pre-Mortem | ![]() Innovation Design Sprint |
|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. |
Complexitydifferent | Medium | Low | High |
Timedifferent | 1-3 h | 20–45 min | 4-5 Tage |
Participantsdifferent | 3-8 | Small cross-functional group | 5-8 |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Risk list, Mitigation plan, Assumption log | Prototype, Test Findings, Decision Rationale |
Tagsno overlap | FailureResilienceRisk | RiskDecisionFailurePlanning | Design sprintPrototypeValidationInnovation |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






