View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Decision Making Three-Point Estimation | ![]() Growth Hooked Model |
|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | The Hooked Model helps clarify engagement loops, user behavior, and experiments. It makes repeat behavior measurable and captures the result as a hooked loop, trigger map, and reward design. |
Complexitydifferent | Low | Medium | Medium |
Timedifferent | 5-20 min | 10-30 min je Item | Multiple workshops over several weeks |
Participantsdifferent | 3-20 | 1-8 | 2-8 |
Formatdifferent | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Three-Point Estimate, Risk Range, Assumption Notes | Hooked loop, Trigger map, Reward design, Ethics check |
Tagsno overlap | EstimationEffortRisk | EstimationUncertaintyForecasting | GrowthBehaviorRetention |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






