View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Systems Thinking Future Reality Tree | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | High | Low |
Timedifferent | 5-20 min | 2-4 h | 45-90 min |
Participantsdifferent | 3-20 | 3-8 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | EstimationEffortRisk | Theory of ConstraintsSystems thinkingChange | AssumptionsRiskDecisionDiscovery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






