View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Systems Thinking Evaporating Cloud | ![]() Systems Thinking Future Reality Tree |
|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. |
Complexitydifferent | Low | Medium | High |
Timedifferent | 5-20 min | 60-120 min | 2-4 h |
Participantsdifferent | 3-20 | 2-8 | 3-8 |
Formatsame | Workshop | Workshop | Workshop |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments | Future Reality Tree, Negative Branches, Assumption List, Improved Injections |
Tagsno overlap | EstimationEffortRisk | Theory of ConstraintsAssumptionsSystems thinking | Theory of ConstraintsSystems thinkingChange |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






