View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Decision Making Constraint Analysis | ![]() Product Discovery MVP Test Matrix |
|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | When several minimal variants compete to answer the same question, it makes comparing and choosing between them cleaner. It separates problem, assumption, solution, and evidence. The result is captured as a Test Matrix and a Test Plan. |
Complexitydifferent | Low | Low | Medium |
Timedifferent | 5-20 min | 30-90 min | 45-75 min |
Participantsdifferent | 3-20 | 2-8 | 2-8 |
Formatdifferent | Workshop | Workshop + async | Workshop |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | Test Matrix, Test Plan |
Tagsno overlap | EstimationEffortRisk | ConstraintsDecisionPlanningOptions | ExperimentsValidationDiscoveryOptions |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






