View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations DMAIC | ![]() Operations PDCA Cycle | ![]() Engineering Kanban |
|---|---|---|---|
Purposedifferent | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. |
Complexitydifferent | High | Low | Medium |
Timedifferent | 2-12 Wochen | 1 h bis mehrere Wochen | Ongoing |
Participantsdifferent | 3-10 | 1-8 | 2-12 |
Formatsame | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Project Charter, Measurement Plan, Cause Analysis, Control Plan | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Kanban board, WIP policies, Flow metrics |
Tagsno overlap | Continuous improvementQualityProcess improvement | Continuous improvementLeanExperiments | FlowVisual managementDelivery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






